Verify cable sizing, joints, insulation, and earthing before commissioning.
Confirm discharge piping, NRV placement, and alignment to reduce mechanical stress.
Avoid dry-run by validating water levels and using protection controllers.
Record baseline performance metrics at commissioning for future troubleshooting.
Use correct tightening torque and sealing practices to prevent leakage and vibration.